Comparing design BOQ vs implementation BOQ was manual and error-prone. Small deviations across hundreds of items led to $2–5M undetected cost overruns per project.
Solution: BOQ Comparison Engine
AI-powered alignment and deviation analysis between mismatched BOQ formats.
Capabilities
Structure Alignment
Fuzzy matching across different BOQ formats
Unit Normalization
Handle inconsistent units and terminology
Category-Level Variance
Detailed cost delta analysis by category
Visualization
Heatmaps, % change tables, high-deviation alerts
Deliverables
Executive variance summary (total +/-%, by category)
Early warning for scope/cost creep (flagged in week 2–3)